November 2015 saw us providing PA services to renowned turnkey production firm Moonlite Productions down at the Bluewater Christmas Lights switch on event. Featuring a distributed 36 box KARA system across four hangs, complete with SB28’s and Moonlite’s own ground stack systems to cover the stage frontage, our custom Galileo drive rack managed the 12 output zones perfectly – keeping the entire system time aligned and isolated… Since extreme winds meant we had to lower the PA hangs shortly before the event, this proved invaluable in making adjustments to the system with no time to make any physical changes to the PA positions or angles.

 

Elsewhere at Milton Keynes shopping centre, our SB18’s and ARCs Wide covered the centreMK Heart Radio Christmas Lights switch on to perfection – Entertec supplied complete site production services including inflatable stage, lighting, snow machines, confetti, and power distribution… once again the impossible wind flawed our best laid plans, and the stage structure had to be deflated for the safety of all involved… but the show went on, and Father Christmas still managed to make an appearance amongst the snow machines to complete a memorable event for all.